UPDATE - 02/07/2012

Cannon Design has just informed us that this project successfully achieved a LEED Gold certification, an upgrade from the LEED Silver that was originally achieved. See more on this project HERE

About

   Design began on the Buffalo State Housing building in 2009 and the building was complete for the Fall Semester of 2011. Restrictions/goals on this project included budget and LEED certification, which can be somewhat conflicting goals.
  
   The building was divided into typical 4 bedroom suites including kitchens and living rooms with some studio and RA/RD suites interspersed. Each suite is equipped with its own heat pump for individual temperature control. These suites are typical and stacked through each floor of the building, so the loop water is routed through each of the top floors of the wings and follows the heat pump stacks down to the lower floors. This proved to be a very efficient way of routing the loop water.

System Selection

Picture
After analysis of various HVAC strategies including fan coil units, PTACS, and variable air volume systems, heat pumps were chosen as an appropriate system because of their efficient nature and ability to do simultaneous heating and cooling. A VAV system was nearly impossible because of the low floor to floor heights. The benefit of a heat pump system is that the energy is transported around the building in the more efficient medium of water rather than air.

The building was divided into typical 4 bedroom suites including kitchens and living rooms with some studio and RA/RD suites interspersed. Each suite is equipped with its own heat pump for individual temperature control. These suites are typical and stacked through each floor of the building, so the loop water is routed through each of the top floors of the wings and follows the heat pump stacks down to the lower floors. This proved to be a very efficient way of routing the loop water.